The operator of the loss-hit Jubilee oil field has said it expects further business interruption (BI) losses in 2017, as the damaged Kwame Nkrumah floating production, storage and offloading (FPSO) vessel is moored into its permanent position.
The operator of the loss-hit Jubilee oil field has said it expects further business interruption (BI) losses in 2017, as the damaged Kwame Nkrumah floating production, storage and offloading (FPSO) vessel is moored into its permanent position.